Projects
- Nicosia Area
- Limassol Area
- Larnaca - Famagusta Area
- Paphos Area
- Other Projects
During 2006 the studies for the following projects were processed in cooperation with the Transmission System Operator (TSO) for approval:
1. Nicosia Area
The following studies were prepared and approved for Nicosia and the surrounding area:
- Interconnection of the Dasoupolis and District Offce transmission substations.
- Replacement of transformers in the Tembria transmission substation.
- A new Dali Industrial Zone 2 x 40MVA GIS 132/22-11KV transmission substation in Nicosia with an underground connection to the transmission network.
The following studies are planned:
- A new Archangelos 2 x 40MVA GIS 132/22-11KV transmission substation in Nicosia
2. Limassol Area
The following studies were prepared and approved for Limassol and the surrounding area:
- The temporary installation of a desalination plant in the grounds of Moni Power Station.
The following studies are planned:
- An Ypsonas Industrial Estate switching transmission substation.
- A Trimiklini-Karvounas-Tembria double circuit 132/66 kV overhead line.
- A new Vassilikos-Ypsonas Industrial Estate Rubus twin circuit overhead transmission line.
- Upgrading of the Vassilikos-Moni overhead transmission line.
- A new Zakaki 132kV transmission substation.
3. Larnaca –Famagusta Area
The following studies were prepared and approved for Famagusta-Larnaca and the surrounding area:
- A new Athienou 132/22-11KV transmission substation.
The following studies are planned:
- Interconnection of the Pyla and Commercial Centre transmission substations via a twin circuit underground transmission cable.
- Dismantling of part of the Dhekelia-Larnaca 132/11kV line.
- Upgrading of the Free Industrial Zone transmission substation.
4. Paphos Area
The following studies were prepared and approved for Paphos and the surrounding area:
- Upgrading of the A, Hadjipaschalis transmission substation to a GIS type and the replacement of medium voltage equipment.
- The installation of a third 132/66kV 45MVA interbus transformer in the Anatoliko substation.
- The relocation/undergrounding of the Anatoliko-New Paphos interconnection.
- Upgrading of the Akoursos transmission substation.
The following studies are planned:
5. Other Projects
The following studies have also been completed:
The following studies are planned:
- Transmission System power factor improvement
- Continuous Modelisation of theTransmission System and Equipment and System Analysis
- Ten-Year Transmission System Development Programme 2008-2017 by the Transmission System Operator
- Introduction of a GIS (Geographical Information System) for the EAC (digitalisation of drawing board work)
- Review of a study for a transmission substation earthing system with the use of CDEGS software
All studies are carried out in collaboration with the Transmission System Operator (TSO) who is directly responsible for the operation and development of the transmission system.