DISTRIBUTION SYSTEM DEVELOPMENT STUDIES
In the context of our efforts to expand and develop the distribution system, (7033) studies were completed in 2007 compared with 6,910 in 2006. Expenditure on construction work for the expansion and development of distribution system in 2007 amounted to (36,6) million compared with ₤28.7 million in 2006.
Other studies:
The following studies have also been completed:
- Calculation of distribution substation electromagnetic fields
- Levels of consumer short-circuit faults in the context of the 16th edition of IET regulations
- Reinforcement of medium voltage distribution system connections in Paphos and the surrounding area
The following studies are planned:
- Studies on the interconnection of Renewable Energy Sources (RES) on the distribution system