Skip to main content
HOME PAGE
USEFUL LINKS
JOB OPPORTUNITIES
CONTACT US
FAQ
ONLINE SERVICES
  
Printer Friendly

SERIES: CABINET FOR METERING PANEL

PLANS: AUTOCAD FILE (dwg.file) - cabinet for metering panel.dwg

           Autodesk Design Web Format File (dwf FILE) -cabinet for metering panel.dwf

DWG. NO. TYPE-LAYOUT CAPACITY IN NUMBER OF METERS TOTAL LOAD CAPACITY PROVISION FOR PHOTOVOLTAIC CELLS MAIN USE
TQ/255-1 Supply from front 1 Metering panel < 300KVA NO Industrial /Commercial Developments
TQ/255-2 Supply from right 1 Metering panel < 300KVA NO Industrial /Commercial Developments
TQ/255-3 Supply from left 1 Metering panel < 300KVA NO Industrial /Commercial Developments
TQ/255-4 Supply from rear 1 Metering panel < 300KVA NO Industrial /Commercial Developments
TQ/255-5 Supply from front 1 Metering panel+1-3 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-6 Supply from right 1 Metering panel+1-3 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-7 Supply from left 1 Metering panel+1-3 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-8 Supply from rear 1 Metering panel+1-3 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-9 Supply from front 1 Metering panel+6-1 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-10 Supply from right 1 Metering panel+6-1 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-11 Supply from left 1 Metering panel+6-1 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-12 Supply from rear 1 Metering panel+6-1 phase < 300KVA POSSIBLE Industrial /Commercial Developments
TQ/255-13 Typical plan for loads>300KVA 1 Metering panel > 3000KVA<600KVA NO Industrial /Commercial Developments

COMMENTS

  • ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  • ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  • ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  • FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  • FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC