SERIES: Cabinet with opening meter board
PLANS: AUTOCAD FILE (dwg file) - Cabinet -openingmeterboard.dwg
Autodesk Design Web Format File (dwf file)- Cabinet-openingmeterboard.dwf
| DWG. NO |
TYPE - LAYOUT |
CAPACITY IN NUMBER OF METERS |
TOTAL LOAD CAPACITY CELLS |
PROVISION FOR PHOTOVOLTAIC |
MAIN USE |
| TQ/254-1 |
Supply from front |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/254-2 |
Supply from right |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/254-3 |
Supply from left |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/254-4 |
Supply from rear |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/254-5 |
In basement-Supply from side |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/254-6 |
In basement-Supply from rear |
16 Equivelant Singlephase |
< 300KVA |
POSSIBLE |
Block of flats/light industrial/warehouses |
| TQ/260 |
Iron structure frame for meter board |
|
|
|
|
COMMENTS
-
ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
-
ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
-
ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
-
FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
-
FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC