Skip to main content
HOME PAGE
USEFUL LINKS
JOB OPPORTUNITIES
CONTACT US
FAQ
ONLINE SERVICES
  
Printer Friendly

 

SERIES: Cabinet with opening meter board

PLANS: AUTOCAD FILE (dwg file) - Cabinet -openingmeterboard.dwg

           Autodesk Design Web Format File (dwf file)- Cabinet-openingmeterboard.dwf

 

DWG. NO TYPE - LAYOUT CAPACITY IN NUMBER OF METERS TOTAL LOAD CAPACITY CELLS PROVISION FOR PHOTOVOLTAIC MAIN USE
TQ/254-1 Supply from front 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/254-2 Supply from right 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/254-3 Supply from left 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/254-4 Supply from rear 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/254-5 In basement-Supply from side 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/254-6 In basement-Supply from rear 16 Equivelant Singlephase < 300KVA POSSIBLE Block of flats/light industrial/warehouses
TQ/260 Iron structure frame for meter board
 

COMMENTS

  •  ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  •  ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  •  ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  •  FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  •  FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC