Skip to main content
HOME PAGE
USEFUL LINKS
JOB OPPORTUNITIES
CONTACT US
FAQ
ONLINE SERVICES
  
Printer Friendly

SERIES: Independent low Cabinet

PLANS: Autocad File (Dwg file) - Independent low Cabinet.dwg

 Autodesk Design Web Format File (dwf file) -Independent low Cabinet.dwf

 

Dwg No. TYPE-LAYOUT CAPACITY IN METER POSITIONS TOTAL LOAD CAPACITY PROVISION FOR  PHOTOVOLTAIC CELLS MAIN USE
TQ/252-1 Along road-Meter towards road 1 - 3phase 100 A NO 1 independent house
TQ/252-2 At right angles to road-Service to the right 1 - 3phase 100A NO 1 independent house
TQ/252-3 At right angles to road-Service to the left 1 - 3phase 100A NO 1 independent house
TQ/252-4 Along road- Meter towards the house 1 - 3phase 100A NO 1 independent house
TQ/252-5 Along road-Meters towards the house 2 - 3phase + Receiver 2X100A YES 1 independent house
TQ/252-6 At right angles to road-Service to the right 2 - 3phase + Receiver 2X100A YES 1 independent house
TQ/252-7 At right angles to road-Service to the left 2 - 3phase + Receiver 2X100 A YES 1 independent house
TQ/252-8 Along the road Meters towards house 2 - 3phase + Receiver 2X100 A YES 1 independent house
TQ/252-9 Along the road-Meter towards road 1 - 3phase + Receiver 100A YES 1 independent house
TQ/252-10 At right angles to road-Service to the right 1 - 3phase + Receiver 100A YES 1 independent house
TQ/252-11 At right angles to road-service to the left 1 - 3phase + Receiver 100A YES 1 independent house
TQ/252-12 At right angles to road -Meter towards house 1 - 3phase + Receiver 100A YES 1 independent house
TQ/252-13 Back to Back for two houses 2 - 3phase + Receiver per house 200A NO 2 adjacent houses
TQ/252-14 Back to Back for two houses 2- 3phase per house 2X100 A NO 2 adjacent houses

COMMENTS

  • ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  • ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  • ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  • FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  • FOR ELECTRICAL LOADS > 300 KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC