SERIES: "build-in" Cabinets
ΣΧΕΔΙΑ: AUTOCAD FILE (dwg file) - "build-in" Cabinets.dwg .
Autodesk Design Web Format File (dwf file)-"build-in" Cabinets.dwf
| DWG. NO. |
TYPE-LAYOUT |
CAPACITY IN METER POSITIONS |
TOTAL LOAD CAPACITY |
PROVISION FOR PHOTOVOLTAIC CELLS |
MAIN USE |
| TQ/253-1 |
Tall- Supply from front |
1 - 3phase |
100A |
POSSIBLE |
1indepentent house |
| TQ/253-2 |
Tall- Supply from left |
1 - 3phase |
100A |
POSSIBLE |
1indepentent house |
| TQ/253-3 |
Tall-Supply from right |
1 - 3phase |
100A |
POSSIBLE |
1indepentent house |
| TQ/253-4 |
Tall -Supply from front |
1 - 3phase + Receiver |
100A |
YES |
1indepentent house |
| TQ/253-5 |
Tall -Supply from left |
1 - 3phase + Receiver |
100A |
YES |
1indepentent house |
| TQ/253-6 |
Tall-Supply from right |
1 - 3phase + Receiver |
100A |
YES |
1indepentent house |
| TQ/253-7 |
Tall-Supply from front |
2 - 3phase + Receiver |
2X100A |
YES |
1indepentent house |
| TQ/253-8 |
Tall-Supply from left |
2 - 3phase + Receiver |
2X100A |
YES |
1indepentent house |
| TQ/253-9 |
Tall-Supply from right |
2 - 3phase + Receiver |
2X100A |
YES |
1indepentent house |
| TQ/253-10 |
Window Type-Supply from front with manhole |
2 - 3phase + Receiver |
2X100A |
YES |
1indepentent house |
| TQ/253-11 |
Window Type-Supply from front without manhole |
2 - 3phase + Receiver |
2X100A |
NO |
1indepentent house |
| TQ/253-12 |
Window Type-Supply from front |
1 - 3phase + Receiver |
80A |
NO |
1indepentent house |
| TQ/253-13 |
Tall- Supply from front, left and right |
2 - 3phase + Receiver |
2X100A |
YES |
1indepentent house |
| TQ/253-14 |
Supply from front |
1 Metering panel |
<300KVA |
NO |
1indepentent house |
COMMENTS
-
ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
-
ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
-
ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
-
FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
-
FOR ELECTRICAL LOADS > 300 KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC