Skip to main content
HOME PAGE
USEFUL LINKS
JOB OPPORTUNITIES
CONTACT US
FAQ
ONLINE SERVICES
  
Printer Friendly

SERIES: Metering Room at Ground Level - Covered Open Space

PLANS:  AUTOCAD FILE (dwg file) - Metering Room at Ground level - Covered Open Space.dwg

            Autodesk Design Web Format File (dwg file) -Metering Room at Ground level - Covered Open Space.dwf

DWG NO. TYPE-LAYOUT CAPACITY IN NUMBER OF METERS TOTAL LOAD CAPACITY PROVISION FOR PHOTOVOLTAIC CELLS MAIN USE
TQ/256-1 EAC and Electrician's Areas Side by Side <48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-2 EAC and Electrician's Areas Side by Side <48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-3 EAC and Electrician's Areas Side by Side >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-4 EAC and Electrician's Areas Side by Side >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-5 EAC and Electrician's Areas Opposite each other >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-6 EAC and Electrician's Areas Opposite each other >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-7 EAC and Electrician's Areas Opposite each other >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-8 Cabinet Type <48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-9 Cabinet Type >48 Equivelant 1-phase > 300KVA POSSIBLE Block of Flats / Comm Development
TQ/256-10 Typical plan for load>300KVA >48 Equivelant 1-phase > 300KVA<600KVA  POSSIBLE Block of Flats / Comm Development

COMMENTS

  • ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  • ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  • ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  • FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  • FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC