The penetration of Renewable Energy Sources (RES) has increased significantly in recent years and has brought significant challenges to Distribution Networks as their development over time cannot support the maximization of this penetration. To make this possible, an overhaul of the Distribution Grid and a transformation of the way the system operates is required.
The actions of the project entitled "Automation of the Distribution System and Installation of SCADA/ADMS (Supervisory Control and Data Acquisition / Advanced Distribution Management System) will transform the Distribution Network into an active and intelligent system. The project will enable the required real-time observability, control, and flexibility to enable the networks to not just connect but integrate users, and green energy to flow seamlessly.
The following results/deliverables are expected from the implementation of the project:
Modernization of the Medium and Low Voltage Networks with the installation of the new switching and switchgear equipment to be installed at AEC's distribution substations for the purpose of information gathering.
Development of a complete infrastructure for the ESDS, i.e. regional equipment and new IT infrastructure for the SCADA/ADMS system
Full operation of the ESMS on a 24x7 basis (The operation of the ESMS is not co-financed)
Installation of the tools/applications for the operational management of the Distribution System, the smooth operation of the Competitive Electricity Market, the integration of RES in the Distribution System, and the interconnection of the system with the other information platforms of the AHK system.
Budget of the project: 27,000,000 €
The project is co-funded by the EU within the framework of the Cohesion Policy Programme “THALIA 2021-2027".