Forward Planning and Development

  • ​​​ Forward planning for the establishment/upgrading of Substations, Overhead and Underground Transmission Network (including licensing, environmental studies, with government services and local authorities, expropriations etc)

  • Transmission System Studies ((load flow, short circuit,   stability, substation earthing, motor starts etc.)

  • Reliability Studies of the Transmission Network

  • Preparation of the 10 Year Transmission Development Program in cooperation with the TSOC

  • Load Forecasting

  • Μεταφοράς Preparation of the Transmission Costing Manual

  • Coordination for the  preparation of the yearly Budget of the Transmission

  • ​Preparation of Terms of Connection to the EAC Network for customers demanding load greater than 8MW and less than 12MW